· Synx Data Labs
Why the Backlog Is Markdown Files, Not a Ticket in Jira
The philosophy underneath every mechanic in this series — why Synx Data Labs runs its engineering backlog as plain markdown files in a git repo instead of an external tracker or project board, and why that choice is what makes six weeks of mechanics actually auditable.
Last week’s post covered the Friday retro — the other bookend to Monday’s planning meeting, and the mechanism that feeds whatever it finds back into the next week’s commitment. That closes the ritual-by-ritual tour this series set out to give: the Monday IPM, the daily standup and cron loop, the claim mechanism that keeps a human and an hourly cron from colliding, /drive’s phase chain, and the retro. Six posts, six mechanics, all public in ccxp-skills. This closing post is about something none of them stated directly: why all of it is built on top of plain markdown files in a git repo, not a ticket in an external tracker — and why that one choice is what makes the other six actually hold up under inspection rather than just sounding reasonable.
One task, one file, no external mirror
Every task this system tracks is a single file: dev/TODO/{id}-{slug}.md, YAML frontmatter on top for the structured fields — status, estimation, scheduled, claimed_by — and prose underneath for everything that doesn’t fit a field: the problem, the design, the test plan, the eventual closing note. There’s no separate database row, no API object, no second place a task’s real state could live. The file is the task, full stop.
There’s no external board at all, synced or otherwise. An earlier version of this system mirrored task status onto a GitHub Project board, with the board’s Iteration field derived by matching each file’s scheduled: date against whichever iteration’s date range contained it — never an independently-set value someone could disagree with the file on. That sync workflow is gone now too: every consumer of iteration membership, from the IPM’s own drain-check gate on down, reads dev/TODO/*.md frontmatter directly instead. scheduled: plus the actual state of dev/TODO/ and dev/JOURNAL/ on disk are fully sufficient, on their own, to answer “what shipped this iteration” — no board, no sync job, no network call anywhere in that answer.
That’s a real, deliberate asymmetry, not an oversight. A system where the board and the file could each have an opinion about a task’s status is a system that needs a tie-breaker, a sync job that can silently fail, and a habit of checking “but which one’s actually right” before trusting either. Making the file the only place truth can live removes the question instead of answering it.
Priority is a position, not a field
Here’s a smaller example of the same instinct, easy to miss: there is no priority: field anywhere in a task’s frontmatter. An earlier version of this schema had one — a free-form Critical/High/Medium/Low value, set once and then quietly drifting out of date as everything around it changed. It’s retired now. Priority today is just a task’s line position in dev/TODO/queue.md, a plain ordered list, top of file is highest priority. Reordering it is editing a text file — move a line, done — not updating a field that duplicates information a human-readable list already expresses directly. /todo next walks that file top to bottom; it doesn’t recompute a score from anything else. The list isn’t a cache of the real priority — it is the real priority.
Closing a task is one commit, not two events linked by convention
This is the detail that actually matters most once code is involved: /drive, the loop covered two posts ago, moves a task’s file from dev/TODO/ to dev/JOURNAL/ inside the same pull request that ships the work the task describes — not a cleanup pass that runs later, not a Friday batch job sweeping up whatever got merged that week. The commit that lands the feature is the commit that marks the task done.
Said plainly, that sounds like a small scheduling detail. It isn’t. The alternative — closing the task in a separate, later action — creates a window where the code is live but the backlog still says “in progress,” or worse, a window where someone marks a task done before the PR that was supposed to finish it actually merged. Either way, you’ve created two events that are supposed to stay in sync and have to be kept in sync by someone remembering to do the second half. Folding them into one commit doesn’t just make that window shorter — it removes the window’s precondition entirely. “Done” and “the file moved to dev/JOURNAL/” are definitionally the same event, because they’re the same diff.
Git history is the whole audit trail
Put those three things together — one file as the only source of truth, a board that’s a derived mirror at best, and a close that’s atomic with the code it closes — and you get a system where the audit trail for why a planning decision got made is the exact same tool as the audit trail for why the code looks the way it does: git log. Not a separate dashboard requiring separate access. Not an export step to run before a tool migration, because there’s no proprietary format to export from — it’s markdown and git, which is to say, nothing you don’t already have. The same person who can read the diff can read the task file that diff closed, in the same git show, because they were never two different systems pretending to be one.
That’s also, incidentally, why this series has been able to cite specific file paths and line numbers throughout — lifecycle.md:90, drive/SKILL.md:188, _session/task_claim.sh:550 — instead of describing the system from memory. Everything in these six posts is something you could have gone and read yourself, in the same public repo, the whole time. That’s not a rhetorical flourish about transparency. It’s the direct, mechanical consequence of the backlog being files instead of a ticket in a system only some of the team has credentials for.
The thread through all seven posts
The first post laid out the shape of a week — three fixed rituals and a continuous build loop — at a glance. The Monday IPM post went deep on how that week’s work actually gets committed to, picked and sized by judgment instead of a budget formula, with a hard gate against anything quietly stranding on a closed iteration. The standup and cron loop post covered the daily check that runs the same way whether a human or an hourly cron kicked it off, and the cost-sane short-circuit that keeps “check every hour” from being a standing bill. The claim mechanism post showed how a human and that same cron share one backlog without colliding — a git merge, doing the job a lock service would otherwise need to do. /drive’s phase chain covered the six-phase loop that turns one claimed task into one shipped, reviewed, merged pull request. And the Friday retro covered how the week gets graded against what Monday committed to, with real numbers instead of institutional memory, feeding straight back into the next Monday.
Every one of those mechanics depends on the property this post describes: a task is a file, the file is the truth, and closing it is the same act as shipping the work. Take that away and you’d still have a claim lock, a design-score gate, a retro that computes real cycle times — but you’d also have a second system to keep in sync with the first, and a question, every time something looked off, about which one to believe. The choice to make the backlog “just files in a git repo” isn’t the most exciting mechanic in this series. It’s the one that makes every other mechanic trustworthy enough to write six posts about.
ccxp-skills is public on GitHub — config-driven, no company-specific dependencies, built to be adopted by any team running Claude Code, not just ours. If any of this series was useful, go read the source. It’s the same place we read it.